Section 3
Installing the System
Use the following procedures to install the hardware modules of your system.

3.1. Install the Cell

Use the following procedure to install all the cells in your system.
Removing the cell from the box requires two people. A fully loaded cell weighs
about 50 kg (110 lb).
1.
Carefully lift the cell from the box using the cell sling and place the cell on a flat
surface.
WARNING
3-1