Appendix A, Acceptance Test Procedure
Turn Up Unit for Customer Traffic
8.
TURN UP UNIT FOR CUSTOMER TRAFFIC
When these acceptance tests are completed successfully, and the default settings are restored, the MX2800
is considered ready for customer traffic. Refer to
uration options and features.
9.
CHECKLIST/SIGN-OFF
Use the table below to check and initial the completion of the Acceptance Test Procedure steps.
Verification of Installed Options
Configuring the Unit for test
Accessing the Craft Port
Provisioning the STS-1 Port
Provisioning the DS1 Ports
Alarm Relay Configuration
Verification of Data Throughput (complete one of three)
DS1 Daisy-chain to STS-1 (hard) Loopback
DS1 to STS-1 "Head to Head" Test
DS1 to STS-1 (hard) Loopback
Verification of Alarms
CRITICAL Alarm Relay Test
NON-CRITICAL Alarm Relay Test
Power Supply Redundancy (complete one of two)
Dual Power Feed, Single Power Supply Card
Dual Power Feed, Dual Power Supply Cards
Controller Card Redundancy Test
Restoration of Default Settings
Customer Traffic Turnup
A-10
Acceptance Test Procedure Steps
Section 3, Configuration
MX2800 STS-1 User Manual
for details on the various config-
Completed (Initial)
61204659L1-1A