Genie GCL-MT Installation Manual page 9

Medium duty operator trolley
Hide thumbs Also See for GCL-MT:
Table of Contents

Advertisement

Drawbar Assembly (cont')
3) Insert the carriage into the tracks as shown in Fig. 3.
NOTE: One end of the carriage has a notch (Detail A) which will be
used to locate the chain pin (Detail B). This end of the carriage faces
the front spreader bracket and away from the power unit.
4) Attach the front spreader bracket to the front of the operator
tracks with two (2) track bolts and two (2) locknuts (check hole
alignment before installing).
5) Position the idler pulley inside the track and insert the
3/8" x 4-1/2" clevis pin. Secure the clevis pin using the
hitch pin. Fig. 4.
NOTE: Track bolts MUST be installed
from inside the track.
GCL-MT
Medium Duty Operator
CLEVIS PIN
LOCK NUT
FRONT
SPREADER
BRACKET
EXPLODED VIEW
www.geniecompany.com
CARRIAGE
NOTCH
DETAIL A
Figure 3
TRACK
IDLER PULLEY
HITCH PIN
LOCK
NUT
TRACK
BOLTS
Figure 4
08-12
TRACK
CHAIN
PIN
CHAIN
DETAIL B
ASSEMBLED VIEW
4.2

Advertisement

Table of Contents
loading

Table of Contents