5.3.2
Change of maintenance parts (Maintenancer only)
If there is no improvement of situation after checking and dealing with referring Section 5.1,
"Help Information," change the hardware following the procedure below.
The maintenance unit of this product is the whole equipment. When failure, please change
whole equipment for the change of the maintenance parts.
Please refer Section 2.6, "CF card insertion and removal," for the respective maintenance.
63
Chapter 5 Troubleshooting
IP-900E/IP-900D series