7. Place the Base Station into the enclosure with the side of the
Base Station with the mounting hole facing the I-beam. The
Base Station should fit tightly between the foam blocks.
8. Screw the outdoor enclosure lid back onto the enclosure.
1725-36127-001-F.doc
Installing on an I-Beam
9
Need help?
Do you have a question about the SpectraLink 6000 System and is the answer not in the manual?