[B] Preparing Hot Water Supply; [C] Final Checks - Hoshizaki JWE-2400CUA-L-25B Installation Manual

Hide thumbs Also See for JWE-2400CUA-L-25B:
Table of Contents

Advertisement

[b] PREPARING HOT WATER SUPPLY

1) If the optional drain valve for low temperature conditions is installed, close the drain
valve provided to prevent freezing.
 2SHQ WKH ZDWHU VXSSO\ YDOYH
3) Follow the instructions in the water heater's instruction manual.

[c] FINAL CHECKS

1) Are independent three-phase 208 to 230V disconnects used?
2) Is the voltage tap switch on the right side of the control box set to the proper voltage?
3) Are the power supply wires connected securely to the disconnects?
4) Have proper ground connections been made?
5) Have all electrical, hot water, drain, and gas connections been made? Do electrical,
hot water, drain, and gas connections meet all national, state, and local code and
regulation requirements?
6) Are the gas and water supplies to the water heater turned on?
 7XUQ RQ WKH ZDWHU KHDWHU WKHQ SUHVV WKH ³212))´ EXWWRQ RQ WKH RSHUDWLRQ SDQHO +DV
the display lit up?
,I \HV WKH DXWR ¿OO F\FOH EHJLQV ZKHQ WKH VHUYLFH SDQHO LV FORVHG
8) Is the display blank? If yes, correct the reverse phase connection according to "6.
3+$6( 5(9(56$/ &+(&.´
 +DV WKH RSHUDWLRQ DXWR ¿OO ZDVK ULQVH PRGH VHOHFWLRQ EHHQ FKHFNHG DJDLQVW WKH
instruction manual?
10) Remove the front panel. Make sure there are no water leaks in the machine
compartment.
11) Does a sufficient amount of detergent and rinse aid remain in the tanks? Are they
properly supplied to the dishwasher?
12) Has the user been instructed on proper operation of the dishwasher?
13) Have the instruction and installation manuals been given to the user?
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jwe-2400cua-r-25b

Table of Contents