6. Cable Wiring

After installing the required number of units on the rack, go to the rear of the rack and provide proper
cable wiring.
Pass cable ties through the cable clamp for the cable handling if necessary.
However, always clamp the AC cord on the unit side (see the figure below).
For other cables, put several cables together and pass each set through repeat ties taking care of the
notes below.
The following figure shows sample wiring of AC cord.
NOTE: To route FC cables, note that the maximum bending
radius should be equal to or larger than 30 mm.