Fedders 23-23-0355N-002 Installation & Operation Manual page 5

Table of Contents

Advertisement

Available languages

Available languages

23-23-0355N-002
CA INSTALLATIO
N-"}
LTERNATE
INSTRUCTIONS
_
Installing
Cabinet
in
Minimum
Width
Window
1,
Remove
filler
panels on air conditioner
cabinet.
2,
Refer to steps 1 through
3 of Window
Installation
instructions.
3,
Close window
until it touches
behind air conditioner
top bar.
4,
Fasten top bar to window
frame using 5/8" washer
head screw.
5,
If filler
is required
on sides of air conditioner,
cut plastic foam seal
to size and fill both sides.
6,
Use silicone or latex sealant (not supplied to fill any minor openings.
7,
Install chassis
into cabinet.
Consult
your authorized
dealer
or importer
for alternative
installation
instructions.
Through-the-wall
Installation
This air conditioner
is designed
as a slide-out
type
chassis,
making
it
possible
to
install
it
through-the-wall
in
both
existing
and
new
construction.
We recommend
that this type
of installation
be performed
with
professional
assistance.
• IMPORTANT: This appliance
must be installed
according
to all
applicable
electrical
and building
codes and ordinances.
• It is recommended
that you have help to install your
unit and that you
use proper
lifting technique
to avoid
personal
injury.
• It is important
that you inspect the condition
of the wall where
the air
conditioner
will
be installed.
• Be sure the wall can support
the weight
of the unit.
• All cabinet
louvers
MUST BE on the outdoor
side of the wall.
DO NOT
BLOCK
SIDE LOUVERS.
• The cabinet
must be installed
level from side-to-side
and with a
downward
tilt from inside to outside.
1,
First remove
the Decorative
front
panel and chassis from the cabinet,
then remove
top bar from the cabinet.
2=
Determine
the size of the opening
for a wood frame
by adding
1/8"
to the width
and height
of the cabinet.
Measure
height from top of
cabinet
to bottom
of bar. Add this measurement
to the thickness
of
wood
used to build the frame. This will determine
the size of wall
opening
needed.
Minimum
1" thick
lumber
is recommended
when
building
the frame.
When
determining
finish
frame thickness,
be sure
not to cover side louvers
on the cabinet.
3.
Install the finished
frame
in the wall
opening
square and level, nail
or screw it securely
to the wall
and place the cabinet
into the framed
wall opening.
4.
Make sure cabinet
projects
into the roomside
of the wall
1 1/4"
at
the top and 1 1/2"
at the bottom to ensure proper tilt and access to
the anti-theft
screw, then fasten cabinet
to the frame
by drilling
twelve
(12) 1" wood screws (not supplied) through
the cabinet
and
into the frame.
(Fig. 1 &2)
If installation
is made
in a building
with
brick veneer
construction,
a
steel angle
lintel
must be used to support
the bricks above the
cabinet.(Fig.3)
5=
Install a 3/4" X 1 1/2" wood
filler strip between
the bottom
bar and
the interior,
caulk
both top and
bottom
of this strip. After cabinet
is
installed
caulk
all openings,
inside and outside
between
finish
frame
and cabinet
to prevent
moisture
from getting
to the interior
of the
wall.
Use of flashing
(driprail)
will further
prevent
water
from
dripping
inside the wall.
6,
Install chassis
into cabinet.
5
@
:...............................
%¸¸,::::¸!!
.....................
C)
Top Bar
(_
Attach top bar here
Fig. 1
Fig. 2
i.
Fig. 3
C)
Wood
frame
(_
1" wood
screws
(_
Cabinet
(_
Bottom
Bar
(_
Interior
wall
(E)
Decorative
Front
C)
Minimum
lx6 wood
support
(nailed
or
screwed
to wood
frame)
(E)2" Wood
frame
(_1
1/2" space
(_1
1/4" space
C)Brick
veneer
(DLintel
angle
(_Caulking
(_Flashing
(drip rail)
(_Side
louvers
C)Wood
filler strip

Advertisement

Table of Contents
loading

Table of Contents