Installation And Startup Checklist - Temco DV1000N/P Installation And Operating Manual

Direct vent zero clearance gas fireplace heater
Table of Contents

Advertisement

TEMCO FIREPLACE PRODUCTS DIRECT VENT FIREPLACES
NOTE: TEMCO Fireplace Products gas logs and fireplaces require installation by a qualified gas appliance installer.
A copy of this checklist must be submitted, along with proof of purchase, when applying to Technical Services for prior
written approval of warranty repair or replacement.
❑ Read and understand installation instructions before attempting installation.
Verify CORRECT FUEL TYPE
❑ Check carton model number.
❑ Check fireplace label. Models ending in N are for natural gas; those ending in P are for propane (LP gas).
WARNING: Using the incorrect fuel can create a serious fire hazard and will void the warranties. Install in
accordance with local and/or natonal codes and ordinances. Follow the TEMCO installation instruc-
tions.
❑ Supply service shutoff valve upstream of gas fireplace.
❑ Gas line size adequate for input rating (BTU's per hour) of fireplace, per National Fuel Gas Code (NFPA54)
in the case of USA installations or Installation Code CAN 1-149 in the case of Canadian installations.
Make following checks:
❑ Gas line integrity at supply line connection.
❑ Glass front panel position.
❑ Correct gas pressure. Inlet Pressure __________(inches w.c.) Manifold Pressure __________(inchesw.c.)
❑ Piezo ignitor function (millivolt control models only).
❑ Pilot ignition.
❑ Main burner ignition.
❑ Proper flame pattern and color.
❑ Positioning of logs (in accordance with instructions).
❑ Clearances to combustibles (vent, framing, mantels, etc.).
❑ Vent system in compliance with instructions. All joints and connections sealed.
❑ Wall switch operation. Do not connect millivolt wiring, wall switch or valve to 120v line voltage unless units is
specifically DSI equipped.
❑ Demonstrated proper operating procedure to homeowner.
❑ Explained the need for proper cleaning and maintenance.
❑ Check all fittings and connections for gas leaks, correct if necessary.
Please sign below that checklist has been completed and understood. DATE INSTALLED ____/____/____
Installer
76657

INSTALLATION AND STARTUP CHECKLIST

Customer Copy
Phone
Temco DV1000/1200/1400 Series
Consumer
Phone
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents