Completing The Installation; Completing The Installation Of A New System - Enterasys 6H308-48 Hardware Installation Manual

Dfe‐gold series module
Hide thumbs Also See for Enterasys 6H308-48:
Table of Contents

Advertisement

Completing the Installation

Modem Port Adapter Wiring and Signal Diagram
RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completing the DFE module installation depends on if the module is being installed in:
a new DFE module system (refer to "Completing the Installation" on page 3‐24), or
an established, operating DFE
of a DFE‐Gold Module in an Existing System" on page 3‐26).

Completing the Installation of a New System

In a new system of DFE modules, one of the installed DFE modules will become the 
management module on chassis power up, and all DFE modules will automatically be set 
to the factory default values. A complete list of the factory default values are provided in 
Chapter 3 of the Enterasys Matrix DFE‐Gold Series Configuration Guide.
After installing all DFE modules into the host chassis and making the connections to the 
network, proceed to "First‐Time Log‐In Using a Console Port Connection" on page 3‐25 to 
access the module management startup screen from your PC, terminal, or modem 
connection.
3-24 Installation
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
module system (refer to "Completing the Installation 
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator

Advertisement

Table of Contents
loading

Table of Contents