Guidelines For Flat Surface Installation; Chassis Bottom, Rubber Feet Placement - Enterasys A2H124-24FX Hardware Installation Manual

Enterasys networks ethernet switches hardware installation guide
Hide thumbs Also See for A2H124-24FX:
Table of Contents

Advertisement

Installing the Switch on a Flat Surface
Figure 3-4
1 Bottom of chassis as seen when chassis is
resting on its back
2 Locations to install the rubber feet (four locations)

Guidelines for Flat Surface Installation

Locate the switch within 152 cm (5 ft) of its power source and on a surface as shown in 
Figure
A temperature of between 0°C (32°F) and 40°C (104°F) must be maintained at the 
installation site with fluctuations of less than 10°C (18°F) per hour.
If an optional redundant power system is going to be installed and connected to the 
14‐pin Redundant Power Supply input connector on the rear of the switch, refer to the 
installation guide shipped with the redundant power system.
3-8 Hardware Installation

Chassis Bottom, Rubber Feet Placement

Á
Â
Â
Note: If a number of switches are being installed in a stack, repeat steps 1 through 4 to
install the rubber feet on each switch before continuing with the installation.
3‐5. 
À
Â
Â
3 Rubber feet with adhesive backing
(four)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack a2 a2h124-24fx

Table of Contents