Switch Rear View - Enterasys A2H124-24FX Hardware Installation Manual

Enterasys networks ethernet switches hardware installation guide
Hide thumbs Also See for A2H124-24FX:
Table of Contents

Advertisement

Figure 3-9

Switch Rear View

À
1 AC power cord
2 AC power connector
3.
Observe the power CPU LED (not shown), located on the front panel. During the 
initialization, the CPU LED will start by illuminating solid amber, then start blinking 
green, then blinking amber, then blinking green again until the end of the 
initialization, and then turns solid green.
Note: If the CPU LED illuminates solid red, there was a critical failure. For more
information about the LED indications and troubleshooting, refer to
additional help, contact Enterasys Networks. Refer to
details
.
If the switch is a standalone switch, it will take approximately 30 seconds for the 
switch to start up. If the switch is a stack Manager, it can take up to 3 minutes or more 
to start up, depending on the number of Member switches in the stack.
Â
Á
3 Connector for external redundant power supply
Connecting AC and RPS-SYS Power
Chapter
4. If you need
"Getting
Help" on page 1-6 for
SecureStack A2 Installation Guide
3-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Securestack a2 a2h124-24fx

Table of Contents