In this chapter, we give instructions on installing NPort IA5150/5250 device servers. Software
installation is covered in subsequent chapters.
The following topics are covered in this chapter:
Panel Layout
Connecting the Hardware
Wiring Requirements
Connecting the Power
Grounding NPort IA5150/5250 Series
Connecting to the Network
Connecting to a Serial Device
LED Indicators
Getting Started
Chapter 2
2
2