Wall Control Preparation - Casablanca Holliston C31UxxZ Owner's Manual

Table of Contents

Advertisement

WaLL ContRoL and haRdWaRe (not to scale)
Switch Mounting
Screws (2)
W-84
Wall Control
Prepare for W-84 Wall Control Bezel replacement
as follows:
Before installing the w-84 wall control you will need to
check and see if you will need to change the bezel on
the front of the wall control from wHItE to AlMoNd.
If you are going to use white, skip these steps and go
to wall control installation starting on page 24. If you
are going to use the AlMoNd bezel and wall plate
you will first need to change the bezel on the front of
the switch before installing the switch in to the wall.
Step 1a. locate the four (4) tabs holding the bezel to
the front of the switch, then press in on each tab one at
a time, removing the bezel as shown in Figure #1.
Step 1b. locate the rubber key pad attached to the
four (4) locating pins as shown in Figure #2 and
remove rubber key pad from the wHItE bezel, also
as shown in Figure #2.
Step 1c. Reinstall the rubber key pad on to the four
(4) locating pins located on the almond bezel as
shown in Figure #3.
White
BeZeL
LoCatinG
PinS
hoLeS(4)
rUBBer keY
Pad
Figure #2
22
W-84 WaLL ContRoL inStaLLation
(For use on product with Both uP and doWn LiGhtS onLY)
3
®
w-84 wall control preparatIon
Switch Bezels
(1) White (pre-installed)
(1) almond
White Wall
almond Wall
Plate (1)
Plate (1)
aLMond
BeZeL
LoCatinG
PinS (4)
rUBBer keY
(4) Wire Cap
Wall Plate Screws
(2) White
(2) almond
BeZeL
BeZeL
taBS
Figure #1
Pad
Figure #3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Holliston

Table of Contents