Installation Procedures
2
a. Insert one of the #8 sheet
metal screws into the screw
hole at the top of the module.
b. If you are not installing a
second module, insert the
other #8 sheet metal screw into
the screw hole at the bottom of
the module. If you are installing
a second module, do not screw
in the bottom screw at this
time.
c. Tighten the screw or screws
until the mounting tracks are
snug against the wall. There
must be a 3/8" (1 cm) gap
between the wall and the rest
of the module . Do not
overtighten the screw or
screws or the module will warp
and fail to operate.
3
a. Label the line and extension
jacks as shown.
b. If you are installing a
two-module system, continue
with "Wall-Mounting a 2-Slot
Carrier and Modules";
otherwise, skip to "Inserting
Batteries in the PARTNER
ACS Processor Module".