Figure 4-9. Connecting The T1 Lines To The Csu - AT&T MERLIN LEGEND Release 2.0 Installation Section

Hide thumbs Also See for MERLIN LEGEND Release 2.0:
Table of Contents

Advertisement

Connecting the Control Unit to the Network Interface
Step 3: Connecting the CSU to the Network Interface
The terminal block (TB1) on the back of the CSU is the connecting point for T1
service lines, fault wires, and Ioopback wires. Also, if a local power supply is
used, the TB1 is the termination spot for the power supply wires.
WARNING:
Voltages as high as 260 V can occur between the transmit and
receive pairs of the T1 line.
Follow this procedure to connect the T1 lines to the CSU (see Figure 4-9):
D8W Cord

Figure 4-9. Connecting the T1 Lines to the CSU

a. Connect the T1 service lines to terminals 1 through 5.
b. Connect the fault pair (if provided by the local telephone company) to
terminals 8 and 9.
Fault
T1
Pair
Trunks
TB
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16
T1
R1 T
R
To Network
Installing the Channel Service Unit
Local power supply leads
17
DC Loopback pair
J1
4-37

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MERLIN LEGEND Release 2.0 and is the answer not in the manual?

Questions and answers

Table of Contents