Resistance And Continuity - Fluke 902 User Manual

Hvac clamp meter
Hide thumbs Also See for 902:
Table of Contents

Advertisement

Resistance and Continuity

To measure resistance or continuity:
To avoid false readings that can lead to
electrical shock and injury, de-energize the
circuit before taking the measurement.
1.
Insert the test leads into the Meter.
2.
Turn the rotary switch to
3.
Take the measurement. The resistance reading
appears on the display.
If the resistance is shorted, the Meter beeps and
shows a reading < 30 .
If the resistance is open or exceeds the Meter's
range, the display reads OL.
XW Warning
P
.
HVAC Clamp Meter
Using the Meter
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents