12 drive LFF
•
25 drive SFF
Install the access panel (on page 25).
1.
Install the server into the rack
2.
Connect each power cord to the server.
3.
Connect each power cord to the power source.
4.
Power up the server (on page 23).
5.
Optical drive option
Power down the server (on page 23).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
("Installing the server into the
rack" on page 40).
Hardware options installation 66