Remove the air baffle.
5.
Install the air baffle
IMPORTANT:
baffle.
Depending on the fan configuration, the air baffle is different. Use the following procedure for either
configuration.
Install the air baffle.
1.
Install the BBWC battery pack.
2.
Install the access panel (on page 25).
3.
Install the server into the rack.
4.
Power up the server (on page 23).
5.
To maintain proper airflow and prevent thermal damage, always install the air
Operations 26