Server Installation; Server Installation Procedures; Measuring With The Template - HP DL360 - ProLiant - G3 Setup And Installation Manual

Hp proliant dl360 generation 3 server setup and installation guide
Hide thumbs Also See for DL360 - ProLiant - G3:
Table of Contents

Advertisement

Server Installation Procedures

To install the rack-mounted server into a Compaq branded rack, complete the
procedures described in the following subsections.

Measuring with the Template

IMPORTANT: Determine the server's place in the rack before starting installation of the
universal rack rails. Refer to the Rack Builder report that was printed during planning of the
rack configuration.
IMPORTANT: The template is two-sided (front and back) and printed with arrows that show
where items will be inserted, both for the universal rack rails and for the thumbscrews that
secure the server faceplate to the front of the rack.
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide

Server Installation

3
3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl360 g3

Table of Contents