Use the following table as a guide for placement of the rails in a Rack System/E
where multiple disk systems will be installed. You can rack multiple disk systems
without gaps by installing rails every three EIA units. For example, starting at the
bottom of a 2-meter rack, set rails at the following unit/hole locations:
Table 7.
Rail Positions for Sequential Disk Systems
Disk Systems
One
1
Two
4
Three
7
Four
10
Five
13
Six
16
Seven
19
Eight
22
Nine
25
Ten
28
Eleven
31
Hole from Rack Bottom
Installation
43