Table 4-1
Pre-Installation Worksheets
Pre-Installation Activities Worksheet
Timing
6 weeks before
installation
At system delivery
System installation
Chapter 4
Activity
•
Select the location for the system. Use
the Site Preparation Guide to satisfy
any requirements to ensure the site is
ready when the system arrives.
•
Assign a person the responsibility of
system Principal Operator.
•
Plan the physical arrangement of the
system and its peripherals.
•
Order supplies that are required for
uninterrupted operation of the system
(consumable supplies).
•
Inspect each shipment as it is
delivered. Note comments and dates
in shipment schedule.
•
When all equipment arrives, contact
the CE to schedule the installation and
verify that the site meets the system
requirements. Installation will be
scheduled within three working days
after Hewlett-Packard has been
contacted.
Arrange for the System Manager to assist
the CE with the installation process.
Site Preparation Kit
Pre-Installation Worksheets
Date
33