Pre-Installation Worksheets

Pre-Installation Activities Worksheet
Timing
6 weeks before
installation
At system delivery
System installation
Chapter 4
Activity
Select the location for the system. Use
the Site Preparation Guide to satisfy
any requirements to ensure the site is
ready when the system arrives.
Assign a person the responsibility of
system Principal Operator.
Plan the physical arrangement of the
system and its peripherals.
Order supplies that are required for
uninterrupted operation of the system
(consumable supplies).
Inspect each shipment as it is
delivered. Note comments and dates
in shipment schedule.
When all equipment arrives, contact
the CE to schedule the installation and
verify that the site meets the system
requirements. Installation will be
scheduled within three working days
after Hewlett-Packard has been
contacted.
Arrange for the System Manager to assist
the CE with the installation process.
Site Preparation Kit
Pre-Installation Worksheets
Date
33