Introduction
Customer Responsibilities
communications equipment such as:
• Any hardware or cables for connection or installation of data
communications equipment
• Network links
• Telephone equipment
• Modems (Consult with your CE for Hewlett-Packard requirements.)
• Equipment supplied by companies other than HP
NOTE
Communications equipment at the computer site is not part of the
computer and must be considered separately for power, space, interface
cabling, and cooling requirements.
Selection of Site Personnel
Depending on the complexity of the computer system, the customer is
responsible for selecting a Site Coordinator, Principal Operator, and a
Site Planning Team. Depending on customer requirements, the Principal
Operator may or may not perform all of these tasks. In some
installations there may be two or three people assigned to the various
"operator" responsibilities.
Site Coordinator
The Site Coordinator is responsible for the following tasks:
• Establishing and maintaining site preparation schedules
• Coordinating construction efforts
• Being the primary liaison with Hewlett-Packard representatives
Principal Operator
The Principal Operator is responsible for the following tasks:
• System operation
• Monitoring site preparation
10
Chapter 1