10. Install and secure the cable management arm to the mid-weight
outer slide assemblies.
11. Extending the cable management arm, slide the server
forward.
12. Route the cables through the cable management arm.
13. Install hook-and-loop straps, as needed, to secure the cables.
NOTE: The yellow plastic shipping tie is not included in
the kit (0684-0860 or equivalent).
14. Install a yellow plastic shipping tie.
NOTE: All M5 screws must be torqued to 6.2 Nm (55 lb).
15. Use the M5 x 16-mm screws to install and secure the tie-down
bracket to the mid-weight right outer slide assembly. If you
have a square-hole rack, insert the M5 x 10-mm screw in hole
(1). If you have a round-hole rack, insert the M5 x 10-mm
screw in hole (2).
Need help?
Do you have a question about the C8000 - Workstation - 0 MB RAM and is the answer not in the manual?