Installing The Oil Pan And Support Lever Base; Installing The Machine Head - Brother BAS-342G Instruction Manual

Direct drive, programmable electronic pattern sewer
Hide thumbs Also See for BAS-342G:
Table of Contents

Advertisement

4-3. Installing the oil pan and support lever base

3964M

4-4. Installing the machine head

Table
3965M
BAS-342G
4. INSTALLATION
(1) Oil pan
(2) Wood screws [4 pcs.]
(3) Oiler
(4) Support lever base
(5) Plain washers [2 pcs.]
(6) Spring washers [2 pcs.]
(7) Bolts [2 pcs.]
1. Place the machine head onto the
table.
NOTE:
• Use a crane or hoist to install the
sewing machine.
• Be careful of the following when
lowering the machine head onto the
table.
! Do not let any cords get clamped
between the machine head and
the table.
! Do not place the machine head
cushion (c) on top of the oil pan
(a) or the support lever base (b).
! Do not let the side (d) of the
safety switch lever touch the
support lever base (b).
(1) Rubber bushes (2 pcs.)
(2) Hinge holders (2 pcs.)
(3) Plain washers [4 pcs.]
(4) Spring washers [4 pcs.]
(5) Bolts [4 pcs.]
(Continued on next page)
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents