Installing The Control Box; Installing The Oil Pan - Brother BAS-311H Instruction Manual

Programmable electronic pattern sewer
Hide thumbs Also See for BAS-311H:
Table of Contents

Advertisement

3. INSTALLATION

3-2. Installing the control box

Operator

3-3. Installing the oil pan

5
3033B
1841B
3034B
BAS-311H
Remove the six screws (1), and then
remove the control box cover (2).
(3) Control box
(4) Bolts [4 pcs.]
(5) Plain washers [4 pcs.]
(6) Spring washers [4 pcs.]
(7) Nuts [8 pcs.]
(8) Power switch
(9) Wood screws [2 pcs.]
(10) Staples [4 pcs.]
(1) Oil pan
(2) Nails [6 pcs.]
(3) Waste oil tank

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents