Connecting The Cords [8] - Brother BAS-342G Instruction Manual

Direct drive, programmable electronic pattern sewer
Hide thumbs Also See for BAS-342G:
Table of Contents

Advertisement

4-13. Connecting the cords [8]

<Main P.C. board>
NOTE:
• Check that the connector is facing the
correct way, and then insert it firmly
until it locks into place.
• Secure the cables with cable ties and
cord clamps, while being careful not to
pull on the connector.
* Be sure to make the ground connection.
(Refer to "4-14. Connecting the ground".)
X pulse motor encoder 5-pin white
Y pulse motor encoder 5-pin blue
Intermittent presser foot pulse motor encoder 5-pin black
Foot switch 10-pin
Operation panel 8-pin
Safety switch 3-pin
Home position sensor assembly 12-pin
STOP switch 6-pin
Valve harness 12-pin
Programmer relay harness 8-pin
Fan 6-pin
3978M
Connector
BAS-342G
1. Remove the cover of the control box.
2. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow.
3. Pass the bundle of cords from the
machine head through the hole in the
table, and then pass it through the
hole in the control box together with
the following cords.
• Tow-pedal foot switch (3)
• Operation panel (Do not pass the
ground wires through the hole.)
• Solenoid valve assembly
4. Securely connect the connectors as
indicated in the table below.
3977M
Connection location on
main P.C. board
P20 (X-ENC)
P4 (Y-ENC)
P5 (P-ENC)
P6 (FOOT)
P1 (PANEL)
P9 (HEAD-SW)
P8 (SENSOR1)
P13 (HEAD)
P12 (AIR1)
P7 (PRG)
P10 (SENSOR2)
(Continued on next page)
4. INSTALLATION
Lock the cord
clamp securely.
Cord clamp
(3)
(3)
(3)
(3)
(3)
(4)
(4)
(4)
(4)
(3)
(4)
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents