This section explains:
Equipment inspection

Unpacking the cabinet

Checking the Accessory Kit
Product installation
Connecting the internal battery
Connecting the EBM(s)
Installation requirements
2.1

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping cartons and packing materials
for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage:
1) File with the carrier within 15 days of receipt of the equipment;
2) Send a copy of the damage claim within 15 days to your service representative.
Check the battery recharge date on the shipping carton label. If the date has passed and the
batteries were never recharged, do not use the UPS. Contact your service representative.
2.2
Unpacking the Cabinet
Unpacking the cabinet in a low-temperature environment may cause condensation to occur
in and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are
absolutely dry (hazard of electric shock).
The cabinet is heavy (see page 31). Use caution to unpack and move the cabinet.
Unpack the equipment and remove all the packing materials and shipping cartoon (see figure 2 for
unpacking 5000 & 6000 VA UPS and External battery cabinets).
Note! Do not lift the UPS or External Battery Cabinets from the front panel.
Figure 2. Unpacking 5000/6000 VA UPS and external battery cabinet.
Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity, flammable gas,
and corrosion.
9130 UPS-EN

2. Installation

Page 5