STEP 5. Assembly of Upper Control Tube and Frame.
1.1
Insert the upper control wire into the control tube plastic, then insert the iron tube of the
control tube into the iron tube of the main frame and tighten with bolts.
1.2
ATTENTION:
1. During assembly, one person should hold the mast while the other person connects
the mast and the frame and fastens them with the bolts.
2. After fastening the bolts, connect the PCB cable connectors together. Be sure to
align them in the right direction before pressing them together. Slide the control tube
plastic boot into position.
BH Fitness • 20155 Ellipse • Foothill Ranch • CA • 92610
www.bhnorthamerica.com • Phone 949-206-8152 • Fax 949-206-0013
ASSEMBLY INSTRUCTIONS CONTINUED
BH FITNESS X4 Elliptical
13
Need help?
Do you have a question about the X4 ELLIPTICAL and is the answer not in the manual?