Eton ATV RXL 50 Service Manual page 45

Table of Contents

Advertisement

Disassembly the driven sprocket, axle and sprocket
collar.
Check the driven sprocket for damage or wear.
Let the rear axle lie in V-blocks and check the run out.
The run out limit is 0.5 mm
Check the turning of bearing with fingers.
The bearings should turn smoothly and quietly.
Replace if necessary.
INSTALLATION
Add grease to the dust seal lips and install dust seals.
Assembly the rear axle and the driven sprocket.
Assembly the drive chain on the driven sprocket.
Assembly the master link and retaining clip.
Note the retaining clip direction.
Install the drive chain cover.
Assembly the chain under cover.
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atv rxl 70Atv rxl 90Rxl 90Rxl 90rAtv rxl 50m

Table of Contents