Chapter 3: Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; System References - Intel SR2520SAXSR - Server System - 0 MB RAM User Manual

User guide
Table of Contents

Advertisement

3
Hardware Installations and
Upgrades

Before You Begin

Before working with your server product, pay close attention to the
at the beginning of this manual.

Tools and Supplies Needed

Phillips* (cross head) screwdrivers (#1 bit and #2 bit)
Needle nosed pliers
Antistatic wrist strap and conductive foam pad (recommended)

System References

All references to left, right, front, top, and bottom assume the reader is facing the front of
the server system as it would be positioned for normal operation.

Removing and Installing from a Rack

Two Intel
rack. The options are the fixed bracket kit and the basic rail kit.
Note: Follow all safety guidelines while removing a system from a rack to avoid injury.

Fixed Bracket Rack Mount Removal

1. Disconnect all cables from the back of the system.
Note: Remember to use the system LED to properly identify the system you are servicing.
2. Remove screws from the brackets and remove the system from the rack.
®
rack options are available to install the Intel
"Safety Information"
®
Server System SR2520SA in a

Advertisement

Table of Contents
loading

Table of Contents