Installation
Heat
shrink
FIG. 14 Installation of relief/cable combo into the AC-CV6T enclosure
VERIFY THE DIRECTION AND LOCATION OF THE STRAIN RELIEF.
The clip must be facing UP (on top).
Once closed, it is difficult to re-open. Grooves align against heat shrink and the flat
circular opening faces away from the enclosure. Refer to FIG. 15 for more
information.
5. Position the strain relief onto the cable with the strain relief located against the heat shrink
tubing (at the base of the tabletop cable split) as shown in FIG. 15 on page 14. The strain relief
should begin clasping after the heat shrink.
10 inches
total
FIG. 15 Tabletop cable and strain relief installation
6. Close the strain relief over the designated location.
Verify the relief is securely closed over the cable and facing the correct
direction. The process of securing the strain relief might require the use of
pliers.
14
Rear view
Strain relief
is mounted on the
edge of the heat shrink
5 inches
(from tip to base)
Circular front of strain relief
lies flush against enclosure
CLIP FACING UP
First - Thread through
Strain relief
RELIEF GROOVES GO INTO ENCLOSURE
FLAT SURFACE POINTS AWAY FROM ENCLOSURE
6" Color Video Touch Panels
Third - Snap closed
Second - Position
cable
Need help?
Do you have a question about the COLOR ACTIVE VIDEO TOUCH PANEL (G3 FIRMWARE) and is the answer not in the manual?