AMX COLOR ACTIVE VIDEO TOUCH PANEL (G3 FIRMWARE) Instruction Manual page 16

6" color video touch panels (firmware version g3)
Hide thumbs Also See for COLOR ACTIVE VIDEO TOUCH PANEL (G3 FIRMWARE):
Table of Contents

Advertisement

Installation
5. Attach the data and power wiring to the touch panel.
6. Test the connection by reconnecting the AXlink connector to the Central Controller. Verify that
the panel is receiving power and functioning properly to prevent repetition of the installation.
7. Disconnect the AXlink connector from the Central Controller until installation is complete.
8. Connect the data and power wiring to the rear of the touch panel.
9. Insert the main unit into the wall cutout until firmly positioned and flush with the wall.
10. Fasten the main AXD unit to the surface using the two (2) drywall clip sets (consisting of
screws and clips) supplied with the enclosure (FIG. 12).
FIG. 12 Screw and clip locations for plasterboard (dry wall) mounting of main AXD unit
11. Place the magnet faceplate (A in FIG. 10) onto the main AXD unit (B in FIG. 10) by gripping
the faceplate and placing it on with gentle force.
12. Reconnect the AXlink wiring to the Central Controller. The touch panel beeps when power is
applied.
12
Dry wall screws
are inserted through the
center holes on the housing.
Dry wall clips and screws
are inserted through the
notches cut out in the wall.
6" Color Video Touch Panels

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COLOR ACTIVE VIDEO TOUCH PANEL (G3 FIRMWARE) and is the answer not in the manual?

This manual is also suitable for:

Axd-cv6Ac-cv6t

Table of Contents