Clemco SCW-1028 Owner's Manual

Clemco SCW-1028 Owner's Manual

Single chamber blast machine for 1 operator

Advertisement

Single Chamber Blast Machine
with manual or pneumatic
media metering valve
Clemco
International GmbH
Revision: 3
OWNER'S MANUAL
for 1 Operator
Carl-Zeiss-Straße 21
83052 Bruckmühl
Germany
Tel.:
+49 (0) 8062 – 90080
Mail:
info@clemco.de
Web: www.clemco-international.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SCW-1028 and is the answer not in the manual?

Questions and answers

Summarization of Contents

3 General description
3.1 Standard blast machine
Standard blast machine equipped with pneumatic remote controls and manual media metering valve.
3.1.1 How the system works
Explains the airflow and operation of the standard blast machine.
3.1.2 How the pneumatic remote control works
Details the function of the pneumatic remote control for safety and operation.
3.2 Blast machine with pneumatically operated media metering valve
Describes the blast machine featuring a pneumatically operated media metering valve.
3.3 Optional electric remote controls
Explains the use of electric remote controls for longer blast hoses.
3.4 Optional remote control with dual function
Covers dual function remote controls for blowing off parts after blasting.
3.4.1 Dual function pneumatic
Details the pneumatic dual function control for opening/closing the metering valve.
3.4.2 Dual function electro-pneumatic
Explains the electro-pneumatic dual function control for metering valve operation.
5 Set-up and operation
5.1 Requirements
Specifies the necessary air supply and conditions for blast machine function.
5.2 Set-up for initial installation or reinstallation
Step-by-step guide for initial installation or reinstallation of the blast machine.
5.3 Daily set-up
Procedure for daily preparation and checks before operation.
5.4 Operation
Instructions for loading abrasive and performing the blasting process.
5.5 Shut-down
Steps for safely shutting down the blast machine.
5.6 Shut-down when moving equipment
Procedures for shutting down the machine before moving it.
6 Maintenance
6.1 General
Overview of maintenance requirements for safe operation and efficiency.
6.2 Daily check list
List of daily checks to ensure proper machine function and safety.
6.3 Weekly check list
Tasks for weekly maintenance and inspection of the blast machine.
8 Replacement parts
8.1 Blast Machines 1440 – 2460
List of replacement parts for Blast Machines 1440 to 2460 models.
8.2 Blast Machines Mighty Mite
Details of replacement parts for the Mighty Mite blast machines.
8.3 Electric panel RME-1 / -2
List of replacement parts for the RME-1 and RME-2 electric panels.

Table of Contents