HP 155606-001 - ProLiant - ML570R01 User Manual page 67

Generation 3 server
Table of Contents

Advertisement

Move the locking switch to the locked position.
10.
NOTE: In hot-plug procedures, all LEDs now turn off except the board status LED, which flashes green while
the board is rebuilding. This process may take several minutes.
Observe the LEDs on the top of the memory board to be sure that the memory is functioning properly
11.
("Memory board LEDs and
board has finished rebuilding.
Replace the access panel
12.
Reinstall the server into the rack (rack servers only)
13.
Removing and installing a memory board (non-hot-plug)
Extend the server from the rack, if applicable
1.
Remove the access panel
2.
Determine which memory board is to be removed by locating the memory board that displays an
3.
amber board status LED. Take note of the failed DIMM, if applicable.
Power down the server (on page 27).
4.
Unlock the memory board locking switch.
5.
Unlock and open the memory board ejector lever.
6.
components" on page 20). The LED states will be valid when the memory
("Access
panel" on page 31).
("Extending the server from the
("Access
panel" on page 31).
("Installing the server into the
Hardware options installation 67
rack" on page 37).
rack" on page 27).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml570

Table of Contents