Dell PowerVault 50F Installation And Troubleshooting Manual page 114

Dell powervault 56f 16-port fibre channel switch installation and troubleshooting guide
Hide thumbs Also See for PowerVault 50F:
Table of Contents

Advertisement

6-6
Installation and Troubleshooting Guide
1.
Insert the system board module into the switch's cavity and tighten the captured
screw until the module is fully inserted.
2.
Reconnect the power supply connector(s).
3.
Reinstall the GBICs.
See "Installing a GBIC Module" found earlier in this chapter for instructions.
4.
Reconnect all external cabling.
5.
Turn on the switch's power.
The switch automatically runs POST .
6.
Check for error messages by issuing the Telnet command.
Replacing the chassis involves removing the switch's GBICs, system board, power
supply(s), fan assembly, and then reinstalling them into the new chassis assembly.
#1 Phillips-head screwdriver
#6 flat-head screwdriver

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervault 51fPowervault 56f

Table of Contents