Dell PowerVault 50F Installation And Troubleshooting Manual page 111

Dell powervault 56f 16-port fibre channel switch installation and troubleshooting guide
Hide thumbs Also See for PowerVault 50F:
Table of Contents

Advertisement

support.dell.com
GBIC modules are installed and removed by inserting them into the system board
from the front of the unit. Simple Network Management Protocol (SNMP) traps are
generated upon GBIC insertion and removal.
1.
Pull down the metal swing bar on the front of the GBIC and pull it out, as shown
in Figure 6-2.
2.
Carefully wiggle the GBIC from side-to-side to unseat it.
If the module has squeeze prongs, squeeze the side prongs and carefully pull the
GBIC out, as shown in Figure 6-3.
To install a GBIC module with squeeze prongs, insert the GBIC module into the port
until its connector is firmly seated into the appropriate port. The latch prongs lock and
prevent the GBIC's accidental removal.
NOTE: The GBIC module is keyed so it can be inserted in only one way. Do not force
the insertion if the module does not slide in easily.
swing bar
squeeze prongs
Repair and Replacement
6-3