1.2 Basic Functions of the ND 1200
Switching on the ND 1200
Switch on the ND 1200. The POWER switch is
located on the rear of the enclosure. After switching
the power on, or after a power failure, the power-up
screen will be displayed.
Press the FINISH key to advance from the power-up
screen to the DRO.
Your ND 1200 is now ready for operation and is in the Current Position
operating mode. Encoder position values will be displayed for all axes.
16
Power-up screen
DRO screen
1 Operation