7. Plug in the power cord and the SCSI ribbon cable.
8. Perform all the steps in "Installing the Drive Module" section
on pages page 2-6 and page 2-7.
Troubleshooting
•
When plugging in the assembly, the CD-ROM hits one of the
other devices or the tower frame.
• The assembly is upside down.
• The CD-ROM drive above or below is upside down.
• One device does not have standard CD-ROM dimensions.
• The mounting hardware is upside down or attached to
the wrong holes.
•
The assembly does not slide in all the way.
• The assembly is upside down.
• The CD-ROM drive above or below is upside down.
• One device does not have standard CD-ROM dimensions.
• The mounting hardware is upside down or attached to
the wrong holes.
For other problems, see chapter 9, "Troubleshooting".
Installing Your Tower 2-9
Need help?
Do you have a question about the J3278B - SureStore CD-ROM Server/Tower 7 NAS Server and is the answer not in the manual?
Questions and answers