Selecting A Site; Unpacking The Server - Compaq 234664-002 - ProLiant - ML330T02 Setup And Installation Manual

Compaq proliant ml330e/ml330 server setup and installation guide
Hide thumbs Also See for 234664-002 - ProLiant - ML330T02:
Table of Contents

Advertisement

2-2 Compaq ProLiant ML330e/ML330 Server Setup and Installation Guide

Selecting a Site

Unpacking the Server

Make sure that the installation area that you select has the following features:
I
A sturdy, level installation site that includes dedicated and properly
grounded (earthed) circuits, air conditioning, and static electricity
protection
IMPORTANT: The ProLiant ML330e/ML330 server must be operated only when in an
upright, vertical position.
I
7.6 cm (3.0 inches) clearance on all sides of server for proper ventilation
I
A separate electrical circuit for the server
CAUTION: Protect the server from power fluctuations and temporary
interruptions with a regulating uninterruptible power supply (UPS). This device
protects the hardware from damage caused by power surges and voltage spikes
and keeps the system in operation during a power failure.
Unpack the server, keyboard, and cables according to the instructions and
illustrations printed on the Quick Start poster.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml330eProliant ml330

Table of Contents