2nd cpu kit for nvr6 standard form d, ai nvr 2 standard form d (15 pages)
Summary of Contents for Avigilon NVR6-AINVR2-FORM-H-10GBASET
Page 1
Avigilon 10G Base-T Kit Installation Guide NVR6-AINVR2-FORM-H-10GBASET NVR6 PRM+ FORM H 200TB-440TB AI NVR 2 PRM+ FORM H 200TB-440TB...
Page 2
Avigilon Corporation nor any of its affiliated companies: (1) guarantees the completeness or accuracy of the information contained in this document; or (2) is responsible for your use of, or reliance on, the information. Avigilon Corporation shall not be responsible for any losses or damages (including consequential damages) caused by reliance on the information presented herein.
Contents Introduction Confirm Package Contents Recommended Tools Installing the 10G Base-T Kit Opening the Cover Installing the 10G Base-T Card in OCP Slot 2 Reattaching the Cover Confirming the Installation For More Information Additional Documentation...
Introduction Avigilon provides an optional 10G Base-T Kit for the NVR6 Premium Plus Form H and AI NVR 2 Premium Plus Form H 200-440 TB. This kit provides you with two high-speed Ethernet ports for faster connections to your security network of ACC Servers and Clients.
Installing the 10G Base-T Kit NOTE If the NVR is an operating part of your security system, be aware that it must be shut down to complete this procedure. Before starting to install the kit: 1. Turn off the NVR, including all attached peripherals. WARNING Opening or removing the system cover while the system is powered on may expose you to a risk of electric shock.
Opening the Cover 1. Remove the complete access panel. a. If necessary, unlock the access panel latch. b. Press the release button. c. Pull up the latch to disengage the access panel from the chassis. d. Slide the access panel toward the rear of the server and lift it from the chassis. NOTE Turn the access panel over to locate the server access panel label.
Installing the 10G Base-T Card in OCP Slot 2 With the NVR open: 1. Unpack the 10G Base-T card. 2. If expansion boards with internal cabling are installed on the center PCI riser cage, disconnect all internal cables from the expansion boards to remove the cage from the server. 3.
Reattaching the Cover When all the components of the kit have been installed: 1. Ensure all expansion card latches are closed and there are filler covers for all empty slots. 2. Close and lock the NVR access panel. 3. If the NVR was rack mounted and removed to install the kit, remount it into the rack. 4.
For More Information For additional product documentation and software and firmware upgrades, visit support.avigilon.com. Technical Support Contact Avigilon Technical Support at support.avigilon.com/s/contactsupport. Additional Documentation AI NVR 2 User Guides NVR6 User Guides Windows Upgrade and Recovery Guide for Avigilon For More Information...
Need help?
Do you have a question about the NVR6-AINVR2-FORM-H-10GBASET and is the answer not in the manual?
Questions and answers