Download Print this page

Danfoss BOCK HA44e Operating Manual page 25

Advertisement

7| Electrical connection
7.8 Function test of the trigger unit INT69 G
Before commissioning, after troubleshooting or making changes to the control power circuit, check
the functionality of the trigger unit. Perform this check using a continuity tester or gauge.
Gauge state
Deactivated state
INT69 G switch-on
Remove PTC connector
Insert PTC connector
Reset after mains on
7.9 Electronic trigger unit INT69 G at LG compressors
The supplied INT69 G must be connected according to the wiring diagram shown here in a separate
control cabinet, which must be installed outside each danger zone.
ATTENTION Install heat protection thermostats and cold conductor motor
0
1
Switch cabinet
1
2
3
4
5
6
7
8
09
EB1
vio
bn
bu
gr
DELTA- P II
© Danfoss | Climate Solutions | 2024.03
Relay position
11-12
11-14
11-12
11-12
11-14
2
winding in series!
Schaltschrank
INT69G
10 11 12
13 20 21
BT1
BT2
BT2
pk
or
Relay position INT69 G
B2 12 14 11
3
4
BT1
BT2
BT3
EB1
BT2
BT.3
Fig. 15
AQ452839384735en-000301 | 25
Fig. 14
5
Cold conductor (PTC
sensor) motor winding
Heat protection thermo-
stat (PTC sensor)
Oil temperature sensor
Oil sump heater
D
GB
6
F
E

Advertisement

loading
Need help?

Need help?

Do you have a question about the BOCK HA44e and is the answer not in the manual?

Questions and answers