Alpha ESS STORION-T50 Operation & Maintenance Manual

Alpha ESS STORION-T50 Operation & Maintenance Manual

Energy storage system (ess)
Hide thumbs Also See for STORION-T50:

Advertisement

Quick Links

@AlphaEnergyStorageSystem
@AlphaESS
Alpha ESS Co., Ltd.
+86 513 8060 6891
info@alpha-ess.com
www.alpha-ess.com
JiuHua Road 888, High-Tech Industrial Development
Zone 226300 Nantong City, Jiangsu Province
Alpha ESS Europe GmbH
+
49 610 3459 1601
europe@alpha-ess.de
www.alpha-ess.de
Paul-Ehrlich-Straße 1a 63225 Langen
Alpha ESS Italy S.r.l.
+39 599 239 50
info@alpha-ess.it
www.alpha-ess.it
Via Loda,17-41013 Castelfranco Emilia(MO)
Alpha ESS UK Co., Ltd
uk@alpha-ess.com
Drake House, Long Street, Dursley, gl11 4hh
Alpha ESS USA, Inc.
USA@alpha-ess.com
638 S Ahwanee Ter Sunnyvale, California,
94085 United States of America
@alpha_ess
@AlphaESS
www.alpha-ess.com
Alpha ESS Suzhou Co., Ltd.
+86 512 6828 7609
info@alpha-ess.com
www.alpha-ess.com
Building 10-A, Canal Town Industrial Park,
99 Taihu E Rd, Wuzhong District, Suzhou 215000
Alpha ESS Australia Pty. Ltd.
+61 1300 968 933
australia@alpha-ess.com
www.alpha-ess.com.au
Unit 1, 2 Ralph Street Alexandria NSW 2015
Alpha ESS Korea Co., Ltd
+82 64 721 2004
korea@alpha-ess.com
2F, 19-4, Nohyeong 11-gil, Jeju-si, Jeju-do,
Republic of Korea
Alpha ESS International Pte. Ltd.
Singapore@alpha-ess.com
Blk 55 Ayer Rajah Crescent #01-01, Singapore
139949
OPERATION & MAINTENANCE MANUAL
INSTALLATIONMANUAL
OF ENERGY STORAGE SYSTEM (ESS)
ENERGYSTORAGESYSTEM(ESS)
STORION-T50/T100 (CONTAINER, WITH M48240-S)
STORION-SMILE-T10(INDOOR)
V02

Advertisement

loading
Need help?

Need help?

Do you have a question about the STORION-T50 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Alpha ESS STORION-T50

  • Page 1 OPERATION & MAINTENANCE MANUAL @AlphaEnergyStorageSystem @AlphaESS @alpha_ess @AlphaESS www.alpha-ess.com INSTALLATIONMANUAL OF ENERGY STORAGE SYSTEM (ESS) Alpha ESS Co., Ltd. Alpha ESS Suzhou Co., Ltd. ENERGYSTORAGESYSTEM(ESS) +86 513 8060 6891 +86 512 6828 7609 STORION-T50/T100 (CONTAINER, WITH M48240-S) info@alpha-ess.com info@alpha-ess.com STORION-SMILE-T10(INDOOR) www.alpha-ess.com www.alpha-ess.com...
  • Page 2: Table Of Contents

    CONTENT Copyright Statement This manual is under the copyright of Alpha ESS Co., Ltd, with all rights reserved. Please INTRODUCTION keep the manual properly and operate in strict accordance with all safety and operating 1.1 Brief Introduction instructions in this manual. Please do not operate the system before reading through the manual.
  • Page 3: Introduction

    INTRODUCTION Introduction 1.1 Brief Introduction METER INSTRUCTION This manual applies for Storion-T50/T100 Li-ion battery energy storage system, mainly 6.1 Function Description includes: 6.2 Introduction (1) Safety introduction 6.2.1. Introduction to the display interface Introduces the product use, operating notes and qualification of operators of T50/T100 6.2.2.
  • Page 4: Safety Instructions

    INTRODUCTION SAFETY INSTRUCTIONS (4) Battery system unit Safety Instructions A combination of batteries through series parallel combination inside and a battery management system (BMS) in which accesses to DC side of a bidirectional converter. 2.1 Manual Keeping (5) Storage unit This manual contains important information about operating the system.
  • Page 5: Setting Of Warning Sign For Safety

    SAFETY INSTRUCTIONS SAFETY INSTRUCTIONS 2.4 Setting of Warning Sign for Safety When doing maintenance works such as checking cables or wires, measuring voltage, replacing small electrical parts or cleaning modules and brackets, as minimum the While instructing, maintaining and repairing, to prevent unrelated personnel nearby to following protective equipment are required: cause incorrect operation or accident, the suggestions below should be followed: Obvious signs should be set at front switch and rear-level switch in case of accidents...
  • Page 6: Ems Instruction

    EMS INSTRUCTION EMS INSTRUCTION Main Interface displays the system working EMS Instruction Power status and information, including: • Power: Total AC output power Pload 00.0kWh • Pload: Total load power. 3.1 Function Description Battery • Battery: State of charge (SOC). •...
  • Page 7: History

    EMS INSTRUCTION EMS INSTRUCTION Battery voltage Battery Ready Reserved Battery current CloseRelay Set whether to forcibly close the relay Battery power Battery Soc50Flag No used Battery SOC Battery RelayL Relay status Set ID Set battery cluster ID (Only for M48112-S) Export Control Set the percentage of the maximum feed-in limit BMS communication status...
  • Page 8 EMS INSTRUCTION EMS INSTRUCTION GeneratorEN Set whether the DG function is turned on Force Set whether to turn on the force Charge charge function Set DG working mode to SOC mode Set whether to turn on the Set DG working mode to time discharge time period function GeneratoMode Allow...
  • Page 9: Information

    EMS INSTRUCTION EMS INSTRUCTION Set the AC power supply to the Subnet Mask Set the subnet mask AC_Grid grid Default AC_Tied Set the default gateway Gateway AC_Genera- Set the AC power supply to DG Ethernet Set the MAC address, here is a fixed MAC Setting System MAC Address...
  • Page 10: Operation

    OPERATION OPERATION B. Turn on the AC air switch of HV900120 in each cluster respectively. If there is an AC Operation main switch, turn it on. 4.1 Check before Operation Before operation, please check the equipment according to following procedures: If no sign of damage is inspected visually outside the system module and all switches are in the "OFF"...
  • Page 11 OPERATION OPERATION E. If the battery status is correct, turn on the battery and PV switches of the system by H. Turn on all the switches in the power distribution box 1, and the equipment inside the pushing up the switch handles. The green indicator of the system starts flashing. After container can be used normally.
  • Page 12: Power-Off Procedures

    OPERATION EMS OPERATION J. Open the distribution box 2, open the front panel of the distribution box at the same EMS operation time, and insert the SIM card into the router. K. Turn on all the switches on the distribution box 2, the router is powered on, and the 5.1 Off-Grid Mode system can start normal operation at the same time;...
  • Page 13: Pmeteroffset Mode

    EMS OPERATION EMS OPERATION 5.2.2.1 Setting Check the STS status is enable:EMS->Setting-> Function->Backup-> BackupBox -> Backup_EN->YES; A. Turn on the function of Pmeteroffset: EMS -> Setting -> Function -> Grid -> Check the meter status is enable:EMS -> Setting -> Function -> CT Meter -> Pmeteroffset ->...
  • Page 14: Time Period Charge And Discharge Mode

    EMS OPERATION METER INSTRUCTION 5.2.4. Time Period Charge and Discharge Mode Meter Instruction Turn on the function of force charge:EMS -> Setting -> Function -> System Mode -> Force Charge -> Enable; 6.1 Function Description Set up the first charge start time: EMS -> Setting -> Function -> System Mode -> Charge Start Time 1;...
  • Page 15: Introduction

    METER INSTRUCTION METER INSTRUCTION 6.2 Introduction 6.2.2. Introduction to programming interface 6.2.1. Introduction to the display interface 1. Press “SET” and the screen shows “PASS” 2. Press “ENT” and the screen shows “0000” Examples of display interface: 3. Input “0001” as the password and press “ENT” 4.
  • Page 16: Setup In On-Grid Mode

    METER INSTRUCTION EMERGENCY STOP 6.3.1. Setup in on-grid mode Emergency Stop Press "SET" to enter the programming interface; Enter the password 0001 and press "Enter" to enter; When the energy storage system is abnormal, you can press the emergency stop button See "BUS1"...
  • Page 17: Online Monitoring

    ONLINE MONITORING ONLINE MONITORING 8.2 Registering License Online Monitoring 8.1 Register You have to create a new account on our web server for the normal monitoring. So please use the following steps: Open the portal: www.alphaess.com. Enter the username and password, then click “Login” to jump to the home page. There will be a prompt after a failed login.
  • Page 18: Routine Maintenance

    ROUTINE MAINTENANCE ROUTINE MAINTENANCE 9.2 Maintenance list Routine maintenance Check whether the cable connection is loose; Check whether the cable is aging or damaged; 9.1 Tool and Consumable Requirements List Check whether the cable insulation tape is dropped; 9.1.1. Tools and equipment requirements Check whether the cable terminal screws are loose and whether there are signs of overheating;...
  • Page 19 ROUTINE MAINTENANCE ROUTINE MAINTENANCE Check the internal Check if there is any System Once 6 PCS internal No abnormal noise temperature of the PCS, abnormal noise when the Once 6 PCS has no abnormal running months temperature including battery system is running conditions months temperature and cabinet...
  • Page 20 ROUTINE MAINTENANCE ROUTINE MAINTENANCE Check the fixation between Check Inspection All battery fixing bolts Once 6 Check content Time Notes Battery fixed the battery and the battery requirements items are tightened months rack 1. Battery The rear surface of the Check whether the wiring front cover of the Once 6...
  • Page 21 ROUTINE MAINTENANCE ROUTINE MAINTENANCE Check that the high-voltage Check whether the The insulation carpet control box is well fixed, Insulated insulation carpet inside the Once 6 inside the container is High-voltage Once 6 and the front panel is close All fixing screws are carpet container is damaged or not damaged and...
  • Page 22 ROUTINE MAINTENANCE ROUTINE MAINTENANCE 2.System The cable of the primary circuit should be firmly Check the power line All switches of the connected, without connection of the primary power distribu- Under normal power-on state, confirm that the deformation, no broken Primary Once 12 circuit, test the insulation...
  • Page 23: Routine Maintenance

    ROUTINE MAINTENANCE ROUTINE MAINTENANCE 9.2.2.2 Power off maintenance 2.System Container system Clean the inside of the container system Once 3 months cleaning Maintenance Maintenance requirements Time items Fixed cable No damage on the surface, no rust or damage terminal of power Once 6 months 1.Battery distribution box...
  • Page 24: Notes

    ROUTINE MAINTENANCE ROUTINE MAINTENANCE H. Life is priceless. Make sure no one would get hurt first. Clean the Paint or vacuum cleaner to remove the attached I. When the fire is outside the containers, please make sure all doors are closed in case Once 6 months ventilation baffle dust...
  • Page 25: Troubleshooting

    TROUBLESHOOTING TROUBLESHOOTING Troubleshooting Fault LCD Fault Fault Name Troubleshooting Category Display Fault LCD Fault Confirm that the ambient Fault Name Troubleshooting Category Display temperature is higher than -10℃.. If it is lower than it, please turn Shut down the system for about on the heating equipment such as Cell discharge heater.
  • Page 26 If there is no fire, please check if Check if the communication cable the DI1 (TOP BMU) interface connector between PCS terminal is connected tightly and (Storion-T50/T100-INV: port 9, restart the system. 10) and TOP BMU (EMS) is If the problem is not resolved, PCS Lost connected and restart the system.
  • Page 27 TROUBLESHOOTING TROUBLESHOOTING Fault LCD Fault Fault LCD Fault Fault Name Troubleshooting Fault Name Troubleshooting Category Display Category Display Check if there is phase loss in the Check if DO2 (TOP BMU)is AC input of the inverter. If there connected properly, and after DC-AC subsystem AC_phase_lost is a phase loss, please power off...