INITIAL CHECK LIST
Once the installation is complete and before starting, check that all operations have been carried out correctly. Use this form
to
request a free initial visit
REGISTER
User:
Retailer:
Installer:
Type of device:
Code:
Serial number :
Manufacture date:
Inlet pressure:
Date: dd
If one of the items in the CONTROL LIST is not respected, it will not be possible to put the device into
operation.
to our service centers throughout the country.
/
mm/yy
Rev.0 – Issue 07/2024
CHECKLIST
Is the venue accessible?
Is
there sufficient room to operate and to allow
maintenance?
Is there a BWT filter before the device (suggested)?
Is there a non-return valve upstream of the dispenser?
Is there a socket powered by 230V and protected, at a
maximum distance of 1.5 m?
Is the appliance constantly supplied with potable water?
Is the water pressure from main constant and between 2
and 4 dynamic bar ?
You have declarations of conformity in accordance with
current food regulations ?
Y
NO
E
S
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
Need help?
Do you have a question about the AQA drink DROP and is the answer not in the manual?
Questions and answers