GETTING STARTED A few simple tools are required: - Measuring tape - Power drill, drill bits ⁄ ” Hex head and/or Phillips driver bit - Flat head screwdriver (used only to remove track) - Pencil Channel: Channel: Additional fasteners other than those 2 CPT61302(W/G) 2 or 3 channel 2 CPT61402(W/G)
Page 3
INSIDE MOUNT A minimum of 1 ⁄ ” is needed to shallow mount a two channel track. A minimum of 1 ⁄ ” is needed to shallow mount a three channel track. A minimum of 2 ⁄ ” is needed to shallow mount a four channel track. A minimum of 2 ⁄...
STEP 2: TRACK INSTALLATION FOR SHADES 100” WIDE OR OVER Unfold the track as shown, being careful not to twist the cords. Make sure that cords are straight Do not allow cords to twist Join the two sections of rail together with the connector clip.
Page 5
Place a removable hanger on a clean surface. Align the top edge of one of the fabric panels to the top Align top of fabric edge of the removable carrier, making sure that the ends are to top of hanger aligned.
OPERATION CORD CONTROL Pull down on the cord to open or close the panels. WAND CONTROL Pull the wand straight across the window opening to open or close the panels. Do not pull the wand toward the room. REMOVING THE SHADE Insert a small flat head screwdriver as shown.
This manual is also suitable for:
Modern architect panel trackArchitect blackout panel trackPremier modern solar panel trackNomad solar panel track
Need help?
Do you have a question about the Architect Light Filtering Panel Track and is the answer not in the manual?
Questions and answers