Download Print this page

Apex & Amp/Bfit/Citadel/Phantom-Xl 400-1000L With Concert Display - FieldServer LonWorks ProtoNode Instruction Manual

Universal gateway

Advertisement

Apex & AMP/BFIT/Citadel/Phantom-XL 400-1000L with Concert Display
3.5
Low Voltage
1
Connections
2
F3
DHW
3
Demand
4
F4
Auto Reset
5
External
Limit
6
P7
Man Reset
7
External
Limit
8
9
Lockout
Alarm
10
D
11
R
12
C
13
LWCO
Figure 3-10: Apex and AMP/BFIT/Citadel/Phantom-XL 400-1000L with Concert Modbus RS485
There are two options for wiring the ProtoNode to an Apex or AMP/BFIT/CTD/PHX 400-1000L with Concert Display.
1. Connect one end of an RJ45 cable to the boiler PCB and cut off the other end of the cable to access the individual
wires of the RJ45 cable. Wire the RJ45 cable as shown above.
2. Wire the ProtoNode to the PCB using the EMS (Delta Only) terminals.
BACnet or
Lonworks
Universal
RJ45
Gateway
Ethernet
Cable
Note: Make connection
to ProtoNode as shown
on previous Page
Figure 3-11: Multiple Apex and AMP/BFIT/CTD 400-1000L Modbus RS485 Wiring
NOTICE:
1. All Apex and AMP/BFIT/CTD/PHX 400-1000L with Concert Display are equipped with a PCB to easily
establish communication with an EMS.
2.
These models can do both Lead Lag (Sequencer) and EMS communication at the same time.
Page 18 of 97
14
13
RS485 GND
12
RS485 -
Header
Sensor
11
RS485 +
10
DHW
Sensor
9
8
Remote
P9
4-20 mA
7
A
6
B
5
C
4
3
A
B
2
C
1
Apex with Concert Display
Low Voltage
1
Connections
2
F3
DHW
3
Demand
24 V Fuse
4
F4
5
Auto Reset
External Limit
Spare 24 V Fuse
6
P7
7
Man Reset
P9
External Limit
8
9
Lockout
Alarm
10
D
11
R
12
C
13
+ PWR
- PWR
ProtoNode
FRAME GND
OR
RJ45 Wire
Wiring
EMS
14
13
12
Header
Sensor
11
10
DHW
Sensor
9
8
Remote
4-20 mA
7
A
6
5
B
C
4
A
3
B
2
C
1
RS485 GND
RS485 -
ProtoNode
RS485 +
Apex with Concert Display
Type A RJ45 Wiring Notes
1 – Wire to White/Green
2 – Wire to White/Orange
3 – Wire to Green
Apex with Concert Display
Type B RJ45 Wiring Notes
1 – Wire to White/Orange
2 – Wire to White/Green
3 – Wire to Orange
Apex with Concert Display
Low Voltage
1
Connections
14
2
13
F3
DHW
3
12
Header
Demand
24 V Fuse
Sensor
4
11
F4
5
Auto Reset
10
DHW
External Limit
Spare 24 V Fuse
Sensor
6
9
7
8
Man Reset
Remote
P9
External Limit
4-20 mA
8
7
9
A
6
Lockout
Alarm
10
5
B
D
11
C
4
R
12
A
3
C
13
B
2
C
1
PN: 106417-05
+ PWR
- PWR
FRAME GND
Up to 8
Boilers
Connected

Advertisement

loading
Need help?

Need help?

Do you have a question about the LonWorks ProtoNode and is the answer not in the manual?