CENTURION SYSTEMS SDO4 SMART Installation Manual page 35

Hide thumbs Also See for SDO4 SMART:
Table of Contents

Advertisement

SECTION 6
Lift the SDO4 SMART to a point
where the control unit (Point B) is in
line with the top of the open garage
door (Point A).
Keeping the control unit in line with
the top of the garage door, place
a spirit level perpendicular to the
ceiling, and line it up with the center
of the drive rail hanger bolt on the
side of the drive rail hanger. Make a
mark on the ceiling, and repeat this
for the other side of the drive rail
hanger.
Ensure that the drive rail
hanger bracket is positioned
directly under a strong
structural member of the
ceiling. If it is not, move
it along the drive rail to
a suitable position before
marking it off on the ceiling.
We recommend that the
maximum cantilever
distance between the
hanger bracket and the
front edge of the control
unit does not exceed
300mm.
(Marked as 'A' in Figure 58)
Draw a line on the ceiling joining
these two marks, perpendicular to
the garage door center line made
earlier.
OPERATOR INSTALLATION - TIP-UP DOORS
Garage door
Point A in line
with Point B
Spirit level
SDO4 SMART
Drive rail
hanger bolt
Spirit level
page 35
SDO4 SMART
A
B
FIGURE 57
Structural
of ceiling
A
FIGURE 58
Garage door center line
FIGURE 59
www.centsys.com
Control
Head
member
Control
unit
Ceiling
SDO4
SMART

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SDO4 SMART and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

T10T12

Table of Contents