6. Spool Positioning on 300mm Vertical Cable Manager

FlexCore
TM
Front Access Optical Distribution Frame offers flexibility for where to install the ODF Fiber
Spool (Panduit Part #: FDUSP) using a repeated pattern of keyholes located on the 300mm vertical
cable manager
Installation Instruction(s) FS198 and FS199 describe how to properly install the spool into the provided
keyholes
If less than 11 enclosures are used, Panduit suggests installation should start from the top enclosure
and work down, without skipping any spools or RU space on the frame to plan properly for moves, adds,
and changes
Below are optimal spools locations for all applications discussed previously
6.1. Single Frame Cross Connect – Right Side
Amount of enclosures on frame: 11
Location of 300mm vertical cable manager(s): Right Side of Frame
Patchcords being routed out of system (ex. Overhead): No
Valid for 2 single frames, back to back option as well
Vertical Cable Manager(s) with Spools
For Technical Support: www.panduit.com/resources/install_maintain.asp
FORM: H2-2642C
TM
Front Access Optical Distribution Frame Patchcord Routing Guide
Installed
DATE: 01JAN18
Spool Mounting Keyholes to use on
Vertical Cable Manager(s)
Page 13 of 17
APPR:TSB
REF PROC:. H1-1954
FS204

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FlexCore FOBKF M1 Series and is the answer not in the manual?

Table of Contents