Download Print this page

Mercia Garden Products 01DTOVAX0806SDFW-V1 Assembly Instructions Manual

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTOVAX0806SDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTOVAX0806SDFW-V1

  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 Fascia 7x60x1016mm QTY 4 please make sure you have a OVLPR60-1016mm suitable base ready to erect your building Fixed Window Strip 12x30x546mm QTY 14 (WITH WINDOW ONLY) 01DTOVAX0806SDFW-V1 S1230-546mm Cover Trims 12x45x1575mm QTY 6 S1245-1575mm 01DTOVAX0806SDNW-V1 MADE IN GREAT BRITAIN...
  • Page 5 Step 1 Nail Bag IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 There may be extra screws present in the nail bag PLEASE SCAN HERE: No. 7 QTY 1 No. 18 QTY 3 50mm Screw x 50 30mm Screw x 142 Place the door (No.
  • Page 6 Step 2 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 2 QTY 1 Parts needed - No. 5 QTY 2 No. 3, (or 4) QTY 1 Place the oors (No.5) on a rm and level base, **Please note: Whether you have purchased ensure the base has suitable drainage free the with windows building or no windows...
  • Page 7 Step 5 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 1 QTY 1 No. 4, (or 3) QTY 1 Place the assembled ridge bar in between the Gables (No. 1&2) in Fix the end of the Window Panel (No.4) (or line with the central uprights Plain Panel) to the already standing panel within the gables.
  • Page 8 Step 8 Step 9 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Parts needed - No. 6 QTY 4 No. 13 QTY 4 Position a Truss Frame (No. 14), centrally Fix the eaves frames (No.13) to each roof sheet (No.6) underneath the join of the two roof sheets (No.
  • Page 9 Step 11 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 15 QTY 1 Parts needed - No. 16 QTY 2 Place the Truss Support Brace (No. 15) Place Truss Block (No. 16) directly underneath the two Truss Frames (No.
  • Page 10 Step 14 Step 13 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 21 QTY 1 No. 22 QTY 1 Once roof xed, attach the building to the oor with Cut the felt (No. 21) into two sheets at 50mm screws. 2500mm (L) x 1000mm (W) and cut a sheet from the capping felt (No.
  • Page 11 Step 16 Step 15 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. For a windowless version go to step 16 Parts needed - No. 10 QTY 6 PLEASE SCAN HERE: Fit the Cover Trims (No.10) over each panel Parts needed - No.
  • Page 12 Step 19 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 25 QTY 1 Parts needed - No. 11 QTY 2 To x the lock in place. Screw the Staple (No.25) to Use 4x30mm Screws to x each beading strip (No.11) onto the door gable (No.1).
  • Page 13 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back Want to share your experience with us? Leave us a review on Feefo, TrustPilot or Google. Your reviews help other people nd and trust our business, as well as helping to play an important role in our growth and improvement!
  • Page 14 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.

This manual is also suitable for:

01dtovax0806sdnw-v1