Download Print this page

Mercia Garden Products 01DTOVPN1006SDFW-V1 Manual

Dip treated overlap pent single door fixed window

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTOVPN1006SDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTOVPN1006SDFW-V1

  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 Before assembly please make sure you have a Ridge Bar 27x44x1712mm QTY 3 suitable base ready to erect your F2744-1712mm building Door Block 28x28x150mm QTY 1 F2828-150mm Eaves Framing 28x28x1475mm QTY 4 F2828-1475mm MADE IN GREAT BRITAIN Window Strips 12x28x580mm QTY 4 S1228-580mm Overall Dimensions: Base Dimensions:...
  • Page 5 Step 1 Nail Bag IMPORTANT: Pre-drill before xing screws. Parts Needed - No.7 QTY 2 There may be extra screws present in the nail bag Secure the oors (No.7) together through framing to framing using 60mm Screw x 6 30mm Screw x 148 10x50mm screws 50mm Screw x 36 20mm Screw x 3...
  • Page 6 IMPORTANT: Pre-drill before xing screws. Step 4 IMPORTANT: Pre-drill before xing screws. Step 3 Parts needed - No. 1 QTY 1 Parts Needed - No.4 QTY 1 PLEASE SCAN HERE: No. 9 QTY 1 - No.5 QTY 1 No. 27 QTY 3 - No.10 QTY 1 Place the Left Gable (No.4) and the Plain Panel 1 Place the door (No.9) within the Door Panel...
  • Page 7 Step 6 IMPORTANT: Pre-drill before xing screws. Step 8 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.2 QTY 1 Parts needed - No.11 QTY 3 - No.3 QTY 1 Align ridge bars (No.11) Place the Window Panel (No.2) and the Right between the front and back of the Gable (No.3) onto the oor, secure at the building , align the middle ridge bar...
  • Page 8 Step 12 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No.26 QTY 1 Parts Needed - No.8 QTY 2 Fix the roof panels onto the top of Cut the felt (No.26) into 2 sheets of the building using 28x30mm 3050mm and lay onto roof as screws, ensuring to be ush on the...
  • Page 9 Step 13 IMPORTANT: Pre-drill before xing screws. Step 14 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.14 QTY 4 PLEASE SCAN HERE: Parts Needed - No.17 QTY 4 - No.15 QTY 3 - No.18 QTY 4 - No.16 QTY 1 Fix the cover trims (No.17 and No.18) to - No.22 QTY 2 the corners and the joins of the building,...
  • Page 10: After Treatment

    Step 16 IMPORTANT: Pre-drill before xing screws. Parts Needed - No.12 QTY 1 - No.21 QTY 2 Fix the Door Beading strips (No.21) to the door panel framing, secure using 4x30mm Screws per strip. It is ESSENTIAL that you apply wood Fix the door block (No.12) onto the treatment immediately after the building door framing using 2x50mm Screws...
  • Page 11 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.